Work Packages

Completed

Work Package 1
Integrated chassis and body shell

Task 1.1. Definition of the chosen overall architecture
Task 1.2. Fully integrated axle powertrain-wheels-suspensions

Completed

Work Package 2
Multifunctional electric power train

Task 2.5. – Implementation of a Direct Flux Control algorithms for the PMaSyR machine on the motor drive

Completed

Work Package 3
Systems integration, management and parameterisation “as a whole”

Task 3.1. Assembling and accessibility to all sub-modules
Task 3.2. Procedures for the holistic control of the drivetrains and ancillary systems

Completed

Work Package 4
 Assembly line for low cost and low energy intensity manufacturing processes

Task 4.1. Production steps: necessary equipment and materials
Task 4.2. Investments in relation to production volumes
Task 4.3. Supply chain

Completed

Work Package 5
New business approaches, based on reasonably low budgets and leading to novel supply Chains

Task 5.1. Case study of success and failure
Task 5.2. Implementation of risk sharing concepts
Task 5.3. Premium vehicles user acceptability

Completed

Work Package 6
Prototype Assembly

Task 6.2. Test with the prototype completed of all functions
Task 6.3. Evaluation of the overall safety aspects
Task 6.4. Fine tuning on the demonstrator of the algorithms developed in WP2

Completed

Work Package 7
Economics, Costs and standards

Task 7.1. Market scenario
Task 7.2. Cost Analysis

Completed

Work Package 8
Exploitation and Dissemination

Task 8.1. Exploitation plan
Task 8.2. Dissemination