Activities

Completed

Phase 1 – 05.09.2017 – 29.12.2017
System requirements

A1.1. Reaction wheel assembly – system requirements.
A1.2. Assessment on motor design – technical approach.
A1.3. Assessment on flywheel design – technical approach.
A1.4. Study and requirements for testbeds.

Completed

Phase 2 – 30.09.2017 – 14.12.2018
Final Project CDR.

A2.1. Design and documentation for the motor functional model.
A2.2. Motor functional model manufacturing.
A2.3. Motor FM test and simulations.
A3.1. Design and documentation for the flywheel model requirements.
A3.2. Flywheel FM manufacturing.
A3.3. Numerical simulations and functional test for flywheel.
A4.1. Design and documentation for RW mechanical assembly.

Completed

Phase 3 – 15.12.2018 – 13.12.2019
Final Report (FR).

A4.2. RW mechanical assembly FM manufacturing and integration.
A4.3. Testbenches development – design and manufacturing.
A4.4. Preliminary tests for RW assembly FM.
A5.1. Sinusoidal, random vibrations; shock test.
A5.2. Thermal tests.