Work Packages

Completed

Work Package 1
System Requirements & Creative Design

Task 1.1. Identification of public acceptance barriers and bottlenecks
Task 1.2. Definition of requirements and specifications according to relevant standards

Completed

Work Package 2
Foam Materials Development

Task 2.1. Cellulose Extraction Process
Task 2.2.
Insulating Foam Materials Development
Task 2.3.
Compliance with Requirements

Completed

Work Package 3
Process development at laboratory scale

Task 3.1. Pilot Processing at Lab scale
Task 3.2. Process Control and Equipment
Task 3.3. Process Performances Evaluation at lab scale

Completed

Work Package 4
Process Scaling up & Manufacturing Guidelines

Task 4.1. Upscaling Pilot Production towards Industrialization
Task 4.2. Process Performances Evaluation at pilot scale
Task 4.3. Application Guidelines

Completed

Work Package 5
Panel Design, LCA & Prototyping

Task 5.1. Panel Design procedures and guidelines for panel design and installation
Task 5.2. CAE, Energy, Thermal and Structural modelling
Task 5.3. Prototyping of full scale panels
Task 5.4. Life Cycle and Life Cycle Cost Assessment

Completed

Work Package 6
Panel Characterisation, Durability Assessment & Compliance with Standards and Regulations

Task 6.1. Measure of Panel Emissions into the Environment
Task 6.2. Analysis of Panel Durability
Task 6.3. Fire Resistance Tests
Task 6.4. Thermal and Acoustic characterisation

Completed

Work Package 7
Full-scale demonstrators, performance monitoring and verification

Task 7.1. Envelope assessment of the demo site
Task 7.2. Retrofitting materials production
Task 7.3. Retrofitting of the demo sites
Task 7.4. Performance monitoring and evaluation towards targets

Completed

Work Package 8
Business model, exploitation and dissemination

Task 8.1. Business model and market strategy
Task 8.2. Dissemination and awareness
Task 8.3. Exploitation and IPR management

Completed

Work Package 9
Financial and Administrative Management

Task 9.1. Project Coordination
Task 9.2. Consortium Management
Task 9.3. Administrative, Financial and Contractual Management

© Icpe | Technologies for Sustainable Development
Terms and Conditions

X